First Corporate Training for ITC.
First Export order – Sultanate of Oman
First Failure Investigation assignment.
First Power System studies assignment.
First Substation detailed Engineering.
First Pre – Bid engineering Services for GE Power.
Detailed Engineering of the first STG Captive Power plant.
First 110kV Transmission line design.
Detailed Engineering of First Cold storage Plant.
Detailed Engineering of First water Sewerage Pumping station at Libya.
Detailed Engineering of the first Static UPS for whole plant at ITC Filtrona Ltd.
First Transmission line design for Eleme Petrochemicals Nigeria.
Basic Study for selection of 690 V System.
First Value Engineering for McKensey & Co.
Detailed Engineering of the first mega (560MW) Solar Power Project for Gujarat.
132 MW substation Design for steel plant for Midhni.
First software validation project for switchyard.
First Building project for CPWD.
First Condition assessment project in USA for a chemical plant.
Britannia Industries- Safety Audit for all plant Electrical System PAN India.
1). First 6 MW Solar plant for Clean Max.
2). First Automatic Storage and Retrieval System (ASRS) Manual for ITC.
3). EHS Manual for Mechanical Systems for ITC.
First Ventilation system audit for ITC.
First Supply of 2 Nos. 6kV swithgear and cable bus duct to Indonesia.